Large and Efficient Multi - Tank Reagent Flotation Self - Suction Flotation Machine
Flotation Machine Of Mechanical Agitation The machine is Spontaneous Imbibe air and ore pulp ,tank is Forward Curved,not
Basic Info
Model NO. | LZJK |
Energy Saving | Energy Saving |
Warranty | 1 Year |
Color | Multi Color |
Customized | Customized |
Condition | New |
After-sales Service | Online Engineer |
Application | Mining Equipment |
Usage | Separate Gold |
Certificate | ISO9001:2008 |
Transport Package | Export Packing |
Specification | LZSF4A |
Trademark | oasis |
Origin | China |
Product Description
Flotation Machine Of Mechanical AgitationThe machine is Spontaneous Imbibe air and ore pulp ,tank is Forward Curved,not liable to precipitation ,Bubble before the return, do not need ancillary equipment,Breathe in large amount , small energy consumption,The impeller can use Polyurethane (pu) or rubber parts,our flotation machine can use Stainless Steel and PVC for material,it can Corrosion resistance to acid and alkali.
Model | Volume(m³ | Impeller Dia(mm) | Impeller speed(r/min) | Capacity(m³/min) | Power(kw) | Weight(kg) | |
Impeller | Scraper | ||||||
LZJK1A | 0.13 | 200 | 600 | 0.05-0.16 | 2.2 | 0.55 | 190 |
LZJK2A | 0.23 | 250 | 500 | 0.12-0.28 | 3 | 0.55 | 390 |
LZJK3A | 0.35 | 300 | 480 | 0.18-0.4 | 2.2 | 0.55 | 426 |
LZJK4A | 0.62 | 350 | 400 | 0.3-0.9 | 3 | 1.1 | 752 |
LZJK5A | 1.1 | 500 | 330 | 0.6-1.6 | 5.2 | 1.1 | 1208 |
LZJK6A | 2.8 | 600 | 280 | 1.5-3.5 | 11 | 1.1 | 2108 |
LZSF4A | 0.37 | 280 | 383/473 | 0.2-0.4 | 1.5 | 0.55 | 466 |
LZSF5A | 1.2 | 450 | 312 | 0.6-1.6 | 5.5 | 1.1 | 1360 |
LZSF6A | 2.8 | 550 | 300 | 1.5-3.5 | 11 | 1.5 | 2126 |
LZSF7A | 4 | 650 | 220 | 2-4 | 15 | 1.5 | 2579 |
LZSF8A | 8 | 760 | 191 | 4-8 | 30 | 1.5 | 4116 |
1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;
2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;
3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.
Send to us